This project required us to remove the front, back and side sloped roof creating a new hip to gable loft extension, and rebuilding the side wall to match the rest of the building.
We created one new bathroom and one new bedroom with walk-in wardrobe, and finished this space by laying wood flooring, tiling the bathroom and decorating to meet our clients’ specification.
We installed a new staircase to match the style of the existing staircase.
This project took a total of 14 weeks to complete and we liaised with building control throughout.
Project Details
Date Published
20th June, 2020
Project Type
Loft Conversion
Location
Hornchurch, London